TIANYU · More possibilities in every moveHandles / Wheels / Trolleys / Luggage components
TIANYU brand logo
TIANYU Made for movement
TIANYUTelescopic Handle
T333 Toolbox pull rod View large image
Product photographs1 / 6
Telescopic Handle series

T333 Toolbox pull rod

Dual-tube telescopic structure, understand the pull rod from the front, side and back. Combined with the box space, confirm the extended height, retracted dimensions and connection method.

Specifications

B Extended Height
465 mm
E Folded Height Including Handle
250 mm
C Cross Bar Length
190 mm
D Tube Center Distance
160 mm
Tube Material
Aluminum tube (original website materials)

The above dimensions are reference values from the original station materials. For current supply specifications, installation hole locations and load-bearing conditions, please refer to the confirmed drawings.

Product details

T333
Understand this pull rodExtension and retractionDimensions and installationStructural detailsSelection consultation

Orderly extension, neat retraction.

From the two states, understand the spatial relationship between the pull rod and the box.

T333 pull rod retracted state front actual photo
Retracted stateView the relative positions of the handle, tube body and upper and lower crossbars.
T333 pull rod extended state back actual photo
Extended stateCheck the telescopic tube sections, crossbars, and back mounting positions.

Confirm dimensions first, then determine the solution.

The dimension letters correspond to the reference parameters above to facilitate communication of installation requirements.

Position schematic for B extended height, C crossbar length, D tube center distance, E retracted height
Schematic shows measurement positions and is not drawn to scale. Please use confirmed product drawings for installation.

Confirm these positions

B / E · Usage and storage space
Check the operating space after the pull rod is extended and the box height after retraction separately.
C / D · Horizontal installation space
Verify the crossbar width and the center distance between the two tubes, and provide the enclosure opening and connection positions at the same time.
Mounting hole positions and load-bearing conditions
The mounting hole spacing is not given in the drawing. Please provide the enclosure structure, connection method and service load for joint confirmation.

The dimensions on this page are reference values from original station documentation. The current supply specifications and load-bearing conditions shall be subject to the confirmed drawings.

See the structure more clearly.

Partial display of original real-shot photos; click to view the complete photo.

T333 top handle and button area

Handle and buttons

The top grip area and operation buttons are centrally arranged. When communicating about model selection, the operation position and enclosure opening can be confirmed at the same time.

T333 actual shot of double tubes and crossbars at oblique angle

Double-tube telescopic structure

The tube bodies on both sides and the upper and lower crossbars form the pull rod frame. Combine the extended and retracted states to verify the installation space required for the product.

T333 back side of crossbars and installation positions

Crossbars and connection positions

The actual shot of the back side facilitates identification of the crossbars and connection parts. Hole positions, fasteners and the fitting method with the case body need to be confirmed item by item.

From installation needs to matching solutions.

Clarify the application, dimensions, and accessory requirements to make every step of communication more specific.

  1. 01

    Communicate usage requirements

    Describe the enclosure or equipment type, operating environment, and estimated quantity.

  2. 02

    Verify dimensions and connections

    Provide drawings, samples, or photos of the installation location to confirm key dimensions.

  3. 03

    Confirm solution and samples

    Discuss materials, appearance, accessories, and sample items requiring confirmation.

  4. 04

    Arrange Follow-up Delivery

    Based on the confirmed solution, communicate production arrangements, packaging and delivery requirements.

Step into the manufacturing site.

From production to inspection, learn about TIANYU's manufacturing processes and provide a concrete basis for communicating your project requirements.

View Manufacturing and Quality
Actual view of TIANYU production workshop
Production site
Actual view of TIANYU inspection area
Inspection area
T333 · Product selection

Find the right fit for your requirements.

Share your case dimensions, installation position and estimated quantity with Tianyu.

Ask about T333
T333Toolbox pull rod
Ask about this product

T333 Toolbox pull rod

T333 Toolbox pull rod
View original image

Find the Right Product for You